Notice of Intent to Adopt – Proposed La Sierra Aquifer Storage and Recovery Well Project Initial Study/Mitigated Negative Declaration

The Carmichael Water District (CWD) has released a Draft Initial Study/Mitigated Negative Declaration (IS/MND) for the proposed La Sierra Aquifer Storage and Recovery Well Project (Project).

Project Location:
3700 Garfield Avenue, Carmichael, CA 95608

Project Description:
The proposed project would construct a new water supply well with aquifer storage and recovery capacity. The La Sierra ASR Well would produce up to 1,500 gallon per minute (gpm) and have a recharge capacity of up to 750 gpm. The project would include related above ground improvements including a fenced perimeter, site paving, installation of a pedestal to rest the motor on, installation of a pump, and constructing a small (8 by 12 feet) prefabricated building to house the chlorine and equipment, a pad to rest electrical equipment and instrumentation controls cabinet and a small shade structure to protect it.

Public Comment Period:
All comments regarding the IS/MND should be received NO LATER THAN 5:00 p.m., on December 9, 2021.  Written comments should be submitted to:

 

Matthew Medill, Engineering Manager

Carmichael Water District

7837 Fair Oaks Boulevard

Carmichael, CA 95608

Tel: (916) 483-2452

matthewm@carmichaelwd.org

 

Click here to view the Draft Initial Study/Mitigated Negative Declaration

Click here to view the Notice of Intent